The next constraint on frontier-scale AI may be less about how many accelerators can be bought than where they can be powered, cooled and connected. That is driving a shift from building ever-larger clusters inside one facility toward linking compute across buildings, campuses and, potentially, regions.

Tom’s Hardware reported on Nov. 20, citing discussion at Supercomputing 2026, that power, cooling and floor-space limits are creating demand for what network engineers call “scale-across” systems. The term describes connecting data centers so workloads can use resources at multiple sites. It is distinct from “scale-up,” which tightly connects processors inside a system, and “scale-out,” which connects servers across a data center.

Why AI makes the network part of the computer

Training large models is not simply a matter of keeping GPUs busy. Accelerators exchange gradients, model parameters and intermediate results as they work. If one device or network path falls behind, synchronized workloads can leave other expensive processors waiting. Faster chips therefore do not guarantee proportionally faster training: communication can become the bottleneck.

Google’s April 2026 description of its Virgo Network makes the infrastructure case from the operator’s perspective. The company says its AI fabric separates tightly coupled scale-up links, accelerator scale-out networking and front-end connections to storage and general-purpose computing. Google says Virgo can connect 134,000 TPU 8t chips in one fabric, but its performance figures—including bandwidth and latency improvements—are company-reported comparisons, not independent measurements.

That example also needs a distinction: Google describes Virgo principally as a scale-out data-center fabric and a “campus-as-a-computer” design. It is evidence that AI networking is being redesigned for very large, network-intensive workloads, not proof that geographically distant data centers already train models as one seamless machine.

Longer links bring a physics bill

Across sites, distance adds propagation delay that optics cannot make disappear. Congestion, packet loss, synchronization and recovery from failures add further costs. For tightly synchronized training, a high-capacity link can still be too slow or unpredictable for some exchanges. Engineers must choose which workloads can tolerate that distance and redesign network topology, communication software and job scheduling around it.

Companies are positioning products for this emerging tier. Cisco said in an Oct. 12 announcement that its Silicon One P200 routing systems, deep-buffered platforms and coherent optics are intended to connect AI fabrics across locations. Marvell, in a Nov. 13 announcement ahead of SC26, said it would demonstrate coherent optical links for data-center connections and other components spanning scale-up, scale-out and scale-across. These are vendor descriptions of products and demonstrations; they do not establish broad deployment, customer performance or that multi-region training is routine.

The practical promise is to put computing capacity where electricity, cooling and space are available, rather than waiting for every resource to fit inside one enormous building. The trade-off is that distributed capacity only helps when the workload can use it efficiently. AI infrastructure is becoming a network-and-software problem as much as a chip problem—and the miles between data centers do not take instructions from a product launch.

Sources